D   a   y       L   o   g
Thursday 24. februára 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 5 6.5 1.5 7 6 5.5 5.5
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.5 15 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 9 12.5 3.5 0.75     -2.75
XII–XIV N       6 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 16.5 18 1.5 5 it.     -4
XVIIb ECh2 19 21.25 2.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 6.5 9 2.5 na     ok
XVIIIb EML2 47 15 19 2.5 na    
XIX AL 21.25 21.5 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       5.25 1.25 2.25 2.75 -4
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5 7.75 6.75 6.25 2.75
I SL 21.5 7 6 5.5
 
16.5 18 MCh 4 -4
-21 -4 -1