D   a   y       L   o   g
Tuesday 24. mája 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 4.5 5 7 6 5.5 2
II EX sur 9 9.75 0.75 0.75     ok
III MCh 47 7 11.5 2.25 1.25     -1
II–III M       3 2     -1
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   5 7 2   2.5 4 -1.75
X FA         2.5 4  
XI F 48 7.5 18 3.75   2.5 4  
XII NCh 13.25 15.75 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       2 9.5 7 5.5 -7.5
XVIIa ECh1 18 20.5 2.5 5 it.     -3
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 4.5 5 0.5 na     ok
XVIIIb EML2 11.5 13.25 1.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5 7.75 6.75 6.25 2.75
I SL 20.5 7 6 5.5
 
7.5 9.75 MCh 4 -1
9 15.75
-24 -2 -1