D   a   y       L   o   g
Sunday 5. júna 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 9.5 11.5 7 6 5.5 -4.5
II EX 9.5 10.25 0.75 0.75     ok
III MCh 10.25 11.5 1.25 1.25     ok
II–III M       2 2     ok
IV FL 11.5 11.75 0.25 0.25     ok
V PrM   11.75 12 0.25 0.25     ok
VI QU 12 12.5 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 20.25 20.5 0.25 4 2.75 2 -3
VIII S2a 1    
IX FP         2.5 4  
X FA   12.5 14 1.5   2.5 4  
XI F         2.5 4  
XII NCh 47 14 17.25 3 2     -1
XIII PrN   17.25 17.5 0.25 0.25     ok
XIV NP F 17.5 19 1.5 0.75     -0.75
XII–XIV N       4.75 3     -1.75
XV S2b 3 2.75 2 -3.25
XVI S3   1.5 3
VII S1       0.25 4 2.75 2 -3
VIII + XV S2         4 2.75 2 -3.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -6.25
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -6.25
IX–XI FS       1.5   2.5 4  
  S       3.25 9.5 7 5.5 -6.25
XVIIa ECh1 19 20.25 1.25 5 it.     ok
XVIIb ECh2 21.25 22 0.75 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2 1.5     -0.5
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 48 15.75 21 0.75 1.25 2.25 2.75 0.5
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR 22 22   0.25     ok
XXI PrB   21 21.25 0.25 ok
I + XIV SLS       13 7.75 6.75 6.25 -5.25
I SL 22 7 6 5.5
 
15.75 16 MCh 4 ok
16 20.5 7
-4 -6 -1