D   a   y       L   o   g
Saturday 11. júna 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 9.25 11 7 6 5.5 -4
II EX 9.25 10 0.75 0.75     ok
III MCh 47 10 14 2.75 1.25     -1.5
II–III M       3.5 2     -1.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14 16.25 2.25 2     -0.25
XIII PrN   16.25 16.5 0.25 0.25     ok
XIV NP 16.5 20.5 4 0.75     -3.25
XII–XIV N       6.5 3     -3.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S       0.25 9.5 7 5.5 -9.25
XVIIa ECh1 20.75 22 1.25 5 it.     ok
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 20.5 20.75 0.25 na     ok
XVIIIb EML2 na    
XIX AL 11 12.25 1.25 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       15 7.75 6.75 6.25 -7.25
I SL 22 7 6 5.5
 
11 12.25 MCh 4 ok
7
-9 -5 -1