D   a   y       L   o   g
Tuesday 20. septembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.75 4.25 5 7 6 5.5 2
II EX   0.75     ms
III MCh 47 6.25 8 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 5.75 11 3.5   2.5 4 -3.5
X FA         2.5 4  
XI F 48 6.75 18.25 4.5   2.5 4 -0.5
XII NCh 49 11 16.5 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 16.5 17.25 0.75 3 2.75 2 -1.25
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.75 4 2.75 2 -1.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -3.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -3.25
IX–XI FS       8   2.5 4 -4
  S       4.25 9.5 7 5.5 -5.25
XVIIa ECh1 18.25 22 3.75 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 4.25 5.75 1.5 na     ok
XVIIIb EML2 11.5 12.25 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5 7.75 6.75 6.25 2.75
I SL 22 7 6 5.5
 
6.25 8 6.75 7.5 MCh 4 -3
7.5 13.25 16 17.25 6.75
11.5 12.25 13.25 16 -15 -2 -1