D   a   y       L   o   g
Friday 30. septembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 47 7 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 7 14 7 1.25     -5.75
II–III M       7 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N         3     ms
XV S2b 49 17 18.5 1.5 3 2.75 2 -1
XVI S3 48 14 17 3   1.5 3 -3
VII S1         4 2.75 2 -2.5
VIII + XV S2       1.5 4 2.75 2 -1
XVI S3       3   1.5 3  
VII+VIII+XV PS       1.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       4.5 8 5.5 4 -3.5
IX–XI FS           2.5 4  
  S       4.5 9.5 7 5.5 -5
XVIIa ECh1 18.5 23 4.5 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh       4.5 1.5     -3
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 23 7 6 5.5
 
only conjectured, unsteady, interrupted... >> overnight Travel to Essen!! MCh 4 -3
conjectured because variously interrupted... KMG-Kongress, 1. Tag 11.5
conjectured -23 -3 -1