D   a   y       L   o   g
Friday 7. októbra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3.25 3.75 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 47 3.75 10.75 4.25 1.25     -3
II–III M       4.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA   10.75 13 2.25   2.5 4 -0.25
XI F   15 17 2   2.5 4  
XII NCh 13 15 2 2     ok
XIII PrN       0.25     ms
XIV NP F 7 9 1.5 0.75     -0.75
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 19.5 26.75 7.25   1.5 3 -5.75
VII S1         4 2.75 2 -1.25
VIII + XV S2         4 2.75 2 -1.25
XVI S3       7.25   1.5 3 -5.75
VII+VIII+XV PS         8 5.5 4 -2.5
VII+VIII+XV+XVI RS       7.25 8 5.5 4 3.25
IX–XI FS       4.25   2.5 4 -0.25
  S       9.5 9.5 7 5.5 ok
XVIIa ECh1 17 19.5 2.5 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 9 10.25 1.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 26.75 7 6 5.5
 
7 8 8.5 10.25 DN, LT MCh 4 -2
8 8.5 8.75
-7 -5 -1