D   a   y       L   o   g
Sunday 6. novembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.75 6 3.25 7 6 5.5 3.75
II EX   0.75     ms
III MCh 47 6 10.25 3 1.25     -1.75
II–III M       3 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   6.5 7.75 1.25   2.5 4  
XII NCh 49 13.5 16.75 3.25 2     -1.25
XIII PrN       0.25     ms
XIV NP F 10.25 19.5 6 0.75     -5.25
XII–XIV N       9.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -3.25
VIII + XV S2         4 2.75 2 -3.5
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -6.75
VII+VIII+XV+XVI RS         8 5.5 4 -6.75
IX–XI FS       1.25   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19.5 22 2.5 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.25 7.75 6.75 6.25 -1.5
I SL 22 7 6 5.5
 
6.5 7.75 2nd Part: DN, LT MCh 4 -2
13.5 16.75 8.75
DN, LT -6 -5 -1