D   a   y       L   o   g
Tuesday 29. novembra 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.25 3 3.25 7 6 5.5 3.75
II EX   0.75     ms
III MCh 3 3.75 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 3.75 21 9.25   2.5 4 -5.25
X FA         2.5 4  
XI F 47 7.75 14 5.5   2.5 4 -5.5
XII NCh 14 14.5 0.5 2     1.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       0.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       14.75   2.5 4 -10.75
  S       9.25 9.5 7 5.5 -0.25
XVIIa ECh1 16.75 18.5 1.75 5 it.     -4
XVIIb ECh2 21 22.25 1.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 14.5 14.75 0.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       3.25 7.75 6.75 6.25 4.5
I SL 22.25 7 6 5.5
 
8.25 9 MCh 4 -3
7.75 8.25 9 14.75 16.75 18.5 4.25
-29 -2 -1