D   a   y       L   o   g
Sunday 5. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.25 12.25 11 7 6 5.5 -4
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     ms
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.25 14.25 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 20.25 21.75 1.5 5 it.     -3
XVIIb ECh2 22.5 23.25 0.75 na     ok
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 14.25 18.5 4.25 na     ok
XVIIIb EML2 19 20.25 1.25 na    
XIX AL 47 18.5 22.5 1.25 1.25 2.25 2.75 ok
XVIII–XIX Out       6.75 1.25 2.25 2.75 -5.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11 7.75 6.75 6.25 -3.25
I SL 23.25 7 6 5.5
 
19 21.75 MCh 4 -4
4.25
-3 -3 -1