D   a   y       L   o   g
Saturday 11. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2.75 9.5 6.75 7 6 5.5 0.25
II EX   0.75     ms
III MCh 9.5 16.75 7.25 1.25     -6
II–III M       7.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA   26 30.5 4.5   2.5 4 -0.5
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 16.75 18 1.25 0.75     -0.5
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.5   2.5 4 -0.5
  S       4.5 9.5 7 5.5 -5
XVIIa ECh1 18.5 26 7.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       7.5 1.5     -6
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 18 18.5 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8 7.75 6.75 6.25 -0.25
I SL 30.5 7 6 5.5
 
MCh 4
14.75
-5 -2 -1