D   a   y       L   o   g
Sunday 12. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 6.5 10.75 4.25 7 6 5.5 2.75
II EX   0.75     0.75
III MCh 10.75 11.5 0.75 1.25     0.5
II–III M       0.75 2     1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA 47 11.5 17 5.25   2.5 4 -1.25
XI F         2.5 4  
XII NCh 17 21 4 2     -2
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       4 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.25   2.5 4 -1.25
  S         9.5 7 5.5 -9.5
XVIIa ECh1 27 28.75 1.75 5 it.    
XVIIb ECh2 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 12.25 12.5 0.25 na    
XVIIIb EML2 na    
XIX AL 21 27 6 1.25 2.25 2.75 -4.75
XVIII–XIX Out       6.25 1.25 2.25 2.75 -5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.25 7.75 6.75 6.25 3.5
I SL 28.75 7 6 5.5
 
12.25 12.5 MCh 4
6.5
-6 -3 -1