D   a   y       L   o   g
Monday 20. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.25 5 2.75 7 6 5.5 4.25
II EX   0.75     ms
III MCh 48 5 13 3.75 1.25     -2.5
II–III M       3.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   6.25 9 2.75   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 49 13 18 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP 49 9 19 1.5 0.75     -0.75
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       2.75   2.5 4  
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 19 20.75 1.75 5 it.    
XVIIb ECh2 22.75 23.75 1 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 47 5.75 16.25 1.75 na    
XVIIIb EML2 20.75 22.75 2 na    
XIX AL 18 18.5 0.5 1.25 2.25 2.75
XVIII–XIX Out       4.25 1.25 2.25 2.75 -3
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.25 7.75 6.75 6.25 3.5
I SL 23.75 7 6 5.5
 
6.25 15 MCh 4
5.75 10 Estimate; included LT... 10.25
10 18.5 15 16.25 Estimate -6 -1 -1