D   a   y       L   o   g
Wednesday 22. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 2.25 2.75 7 6 5.5 4.25
II EX   0.75     ms
III MCh 47 2.25 9 3.25 1.25     -2
II–III M       3.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 3.25 14.75 6.5   2.5 4 -2.5
X FA   9 11.25 2.25   2.5 4 -2.25
XI F         2.5 4  
XII NCh 14.75 16.5 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 16.5 18 1.5 0.75     -0.75
XII–XIV N       3.25 3     NA
XV S2b 21.5 22.5 1 3 2.75 2 -1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       1 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -3
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       8.75   2.5 4 -4.75
  S       7.5 9.5 7 5.5 -2
XVIIa ECh1 18 21.5 3.5 5 it.    
XVIIb ECh2 22.5 24.5 2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5.5 1.5     -4
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.25 7.75 6.75 6.25 3.5
I SL 24.5 7 6 5.5
 
3.25 6.25 6.75 7.25 MCh 4
6.25 11.25 10.5
-6 -1 -1