D   a   y       L   o   g
Monday 27. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 6 6.5 0.5 7 6 5.5 6.5
II EX   0.75     ms
III MCh 47 9 13.25 2.25 1.25     -1
II–III M       2.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 17 3.75   2.5 4  
X FA         2.5 4  
XI F   14.5 15.5 1   2.5 4 -0.75
XII NCh 13.25 14.5 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP F 6.75 7.75 1 0.75     -0.25
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.75   2.5 4 -0.75
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 17.5 20 2.5 5 it.    
XVIIb ECh2 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 7.75 9 1.25 na    
XVIIIb EML2 17 17.5 0.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       1.5 7.75 6.75 6.25 6.25
I SL 20 7 6 5.5
 
10 12 MCh 4 -1
6.75 10 12 15.5 6
-9 -1 -1