D   a   y       L   o   g
Tuesday 28. februára 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -4 3 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 47 3 11 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP 48 5.25 20.75 7.25   2.5 4 -7.25
X FA   15.25 16.75 1.5   2.5 4 -1.5
XI F 49 7 18.5 4   2.5 4  
XII NCh 11.75 13.75 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       12.75   2.5 4 -8.75
  S       7.25 9.5 7 5.5 -2.25
XVIIa ECh1 20.75 23 2.25 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 4.75 5.25 0.5 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 23 7 6 5.5
 
4.75 10.25 MCh 4
7 8.5 10.25 13.75 15.25 18.5 6.75
8.5 11 11.75 16.75 -10 -2 -1