D   a   y       L   o   g
Thursday 2. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3 6.25 9.25 7 6 5.5 -2.25
II EX   0.75     ms
III MCh 47 6.25 10.25 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 6.75 15 3.5   2.5 4  
XII NCh 49 12.25 19 5.25 2     -3.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.5   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19.75 21.75 2 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2 1.5     -0.5
XVIIIa EML1 10.25 11 0.75 na    
XVIIIb EML2 19 19.75 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.25 7.75 6.75 6.25 -1.5
I SL 21.75 7 6 5.5
 
6.75 8.75 MCh 4
8.75 13.5 9.25
13.5 15 -1