D   a   y       L   o   g
Thursday 9. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 4.25 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 4.25 8.5 3.25 1.25     -2
II–III M       3.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.25 9.5 1.5   2.5 4 -1.5
X FA         2.5 4  
XI F 48 13.5 18.5 3.5   2.5 4 -3.5
XII NCh 49 12.25 15.75 2.75 2     -0.75
XIII PrN       0.25    
XIV NP F 15.75 16.5 0.75 0.75     ok
XII–XIV N       3.5 3     -0.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5   2.5 4 -1
  S       1.5 9.5 7 5.5 -8
XVIIa ECh1 18.5 20.5 2 5 it.    
XVIIb ECh2 21.5 22.25 0.75 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 47 5 12.25 3.25 na      
XVIIIb EML2 49 20.5 23.75 2.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.75 1.25 2.25 2.75 -4.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 23.75 7 6 5.5
 
5 5.5 6.25 6.75 5.5 9.5 MCh 4 -1
6.75 8.5 15 16.5 8.75
21.5 22.25 13.5 15