D   a   y       L   o   g
Sunday 12. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 9.5 10.5 7 6 5.5 -3.5
II EX   0.75     ms
III MCh 9.5 11 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 11.75 19.75 4   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14.25 15.5 1.25 2     0.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 15.5 17.75 2.25   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.25   1.5 3 -0.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -1.75
IX–XI FS       4   2.5 4  
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 19.75 23 3.25 5 it.    
XVIIb ECh2 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 11 11.75 0.75 na    
XVIIIb EML2 na    
XIX AL 13 13.5 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10.5 7.75 6.75 6.25 -2.75
I SL 23 7 6 5.5
 
13 13.5 14.25 17.75 MCh 4 -2
6
Banket Day 1