D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 21. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.5 9.25 6.75 7 6 5.5 0.25
II EX   0.75     ms
III MCh 47 9.25 10.5 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 10.5 18.25 3.25   2.5 4  
XII NCh 48 12 15 2.5 2     -0.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 47 18.25 26.5 4.5   1.5 3 -1.5
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       4.5   1.5 3 -1.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       4.5 8 5.5 4 0.5
IX–XI FS       3.25   2.5 4  
  S       4.5 9.5 7 5.5 -5
XVIIa ECh1 20.5 24 3.5 5 it.    
XVIIb ECh2 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 49 9.75 16.5 2.25 na    
XVIIIb EML2 26.5 28 1.5 na    
XIX AL 20.25 20.5 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       4 1.25 2.25 2.75 -2.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 28 7 6 5.5
 
9.75 10 20.25 24 MCh 4
12 16.5 13.25 13.75 7
10 13.25 13.75 15 1