D   a   y       L   o   g
Thursday 6. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -5 5.25 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 6 7 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   5.75 6 0.25   2.5 4 -0.25
X FA         2.5 4  
XI F 47 7 14 5   2.5 4 -1
XII NCh 48 10 15.5 3.5 2     -1.5
XIII PrN       0.25    
XIV NP 15.5 19 3.5 0.75     -2.75
XII–XIV N       7 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.25   2.5 4 -1.25
  S       0.25 9.5 7 5.5 -9.25
XVIIa ECh1 20 21.25 1.25 5 it.    
XVIIb ECh2 49 22.25 23.75 1.5 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 5.25 5.75 0.5 na    
XVIIIb EML2 19 20 1 na    
XIX AL 21.25 22.25 1 1.25 2.25 2.75 0.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       13.75 7.75 6.75 6.25 -6
I SL 23.75 7 6 5.5
 
10 12 MCh 4
12 14 incl. some DN, LT... 7.25
incl. some DN, LT... -1