D   a   y       L   o   g
Friday 7. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.25 6.75 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 8.75 18 6.75   2.5 4 -2.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.5 15 2.5 2     -0.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 48 20 25.75 3.75   1.5 3 -0.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       3.75   1.5 3 -0.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       3.75 8 5.5 4 -0.25
IX–XI FS       6.75   2.5 4 -2.75
  S       10.5 9.5 7 5.5 1
XVIIa ECh1 18 20 2 5 it.    
XVIIb ECh2 22 24 2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4 1.5     -2.5
XVIIIa EML1 6.75 8.75 2 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 25.75 7 6 5.5
 
12.5 15 MCh 4 -4
22 24 6.5
-1