D   a   y       L   o   g
Sunday 9. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.75 5.5 6.25 7 6 5.5 0.75
II EX   0.75     ms
III MCh 5.5 7 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14 14.5 0.5 2     1.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       0.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 47 7 22.5 13.5   1.5 3 -10.5
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       13.5   1.5 3 -10.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       13.5 8 5.5 4 5.5
IX–XI FS           2.5 4  
  S       13.5 9.5 7 5.5 4
XVIIa ECh1 20 21.5 1.5 5 it.    
XVIIb ECh2 23.5 24.25 0.75 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 22.5 23.5 1 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 24.25 7 6 5.5
 
14 14.5 20 21.5 MCh 4
4.25
the ultimate Smilies Analysis Day... 1