D   a   y       L   o   g
Tuesday 25. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 4.5 5 7 6 5.5 2
II EX   0.75     ms
III MCh 47 4.5 14.5 4 1.25     -2.75
II–III M       4 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 16 7.25   2.5 4 -3.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14.5 14.75 0.25 2     1.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       0.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.25   2.5 4 -3.25
  S       7.25 9.5 7 5.5 -2.25
XVIIa ECh1 18 21.5 3.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 16 18 2 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5 7.75 6.75 6.25 2.75
I SL 21.5 7 6 5.5
 
6.5 12.5 MCh 4
12.5 14.75 7.75
-1