D   a   y       L   o   g
Wednesday 26. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2.5 7.25 9.75 7 6 5.5 -2.75
II EX   0.75     ms
III MCh 7.25 8.5 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 8.5 15.75 6.25   2.5 4 -2.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25   2.5 4 -2.25
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 19.5 21.75 2.25 5 it.    
XVIIb ECh2 24.5 25.25 0.75 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3 1.5     -1.5
XVIIIa EML1 9.75 10.75 1 na    
XVIIIb EML2 21.75 24.5 2.75 na    
XIX AL 15.75 19.5 3.75 1.25 2.25 2.75 -2.5
XVIII–XIX Out       7.5 1.25 2.25 2.75 -6.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 25.25 7 6 5.5
 
MCh 4
9.75 10.75 4.25
-1