D   a   y       L   o   g
Thursday 27. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.25 5.75 4.5 7 6 5.5 2.5
II EX   0.75     ms
III MCh 47 5.75 10.75 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 48 7 18.25 4.75   2.5 4 -0.75
XII NCh 47 11.75 17.5 4.25 2     -2.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       4.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4.75   2.5 4 -0.75
  S         9.5 7 5.5 -9.5
XVIIa ECh1 18.25 20.25 2 5 it.    
XVIIb ECh2 21 24 3 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5 1.5     -3.5
XVIIIa EML1 24 25 1 na    
XVIIIb EML2 na    
XIX AL 49 10.5 21 2 1.25 2.25 2.75 -0.75
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       4.5 7.75 6.75 6.25 3.25
I SL 25 7 6 5.5
 
7 9.5 12.5 14 MCh 4
9.5 12.5 14 17.5 11.75
11.75 20.25 Acer 21" 1