D   a   y       L   o   g
Saturday 29. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.25 8.5 8.25 7 6 5.5 -1.25
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 10.5 11 0.5 0.75     0.25
XII–XIV N       0.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19.75 21.5 1.75 5 it.    
XVIIb ECh2 22.75 23.5 0.75 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 47 8.5 19.75 10.75 na    
XVIIIb EML2 21.5 22.75 1.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       12 1.25 2.25 2.75 -10.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 23.5 7 6 5.5
 
10.5 11 MCh 4
2.5
another Day of Forum Outbursts, including DU & KB Layout 1