D   a   y       L   o   g
Wednesday 3. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.5 3.75 3.25 7 6 5.5 3.75
II EX   0.75     ms
III MCh 3.75 5.25 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   5.25 5.75 0.5   2.5 4 -0.5
X FA         2.5 4  
XI F   5.75 22 16.25   2.5 4 -12.25
XII NCh 2     ms
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       16.75   2.5 4 -12.75
  S       0.5 9.5 7 5.5 -9
XVIIa ECh1 47 22 23.5 1.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.5 1.5      
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       3.25 7.75 6.75 6.25 4.5
I SL 47 23.5 7 6 5.5
 
Estimates MCh 4
3
-1