D   a   y       L   o   g
Friday 5. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 6.5 7.5 7 6 5.5 -0.5
II EX   0.75     ms
III MCh 6.5 8 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   8 12 4   2.5 4  
XII NCh 12 16.5 4.5 2     -2.5
XIII PrN       0.25    
XIV NP 16.5 16.75 0.25 0.75     0.5
XII–XIV N       4.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 16.75 23 6.25 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       6.25 1.5     -4.75
XVIIIa EML1 23 26 3 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 28.5 7 6 5.5
 
MCh 4
12.25
-1