D   a   y       L   o   g
Tuesday 9. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.5 3.75 5.25 7 6 5.5 1.75
II EX   0.75     ms
III MCh 47 3.75 11.5 2.75 1.25     -1.5
II–III M       2.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 49 4.25 10 2.5   2.5 4 -2.5
X FA         2.5 4  
XI F 48 7 18.25 5.25   2.5 4 -1.25
XII NCh 12.75 13.5 0.75 2     1.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       0.75 3     NA
XV S2b 15 17 2 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2 4 2.75 2  
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -2
VII+VIII+XV+XVI RS       2 8 5.5 4 -2
IX–XI FS       7.75   2.5 4 -3.75
  S       4.5 9.5 7 5.5 -5
XVIIa ECh1 18.25 22.5 4.25 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1 11.5 12.75 1.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.25 7.75 6.75 6.25 2.5
I SL 22.5 7 6 5.5
 
4.25 6.25 7 10 MCh 4
9.5 13.5 15 17 7.75
6.25 9.5 -1