D   a   y       L   o   g
Wednesday 10. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.5 4.5 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 4.5 8.5 2.25 1.25     -1
II–III M       2.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 5.75 9.75 2.25   2.5 4 -0.25
X FA         2.5 4  
XI F 49 8.5 11 2   2.5 4  
XII NCh 13.25 21.5 8.25 2     -6.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       8.25 3     NA
XV S2b 11 11.5 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       4.25   2.5 4 -0.25
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 11.5 13.25 1.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 21.5 7 6 5.5
 
5.75 7.5 MCh 4
7.5 9.25 10.5
9.25 9.75 -1