D   a   y       L   o   g
Monday 15. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 4.75 6.25 1.5 7 6 5.5 5.5
II EX   0.75     ms
III MCh 10 11 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 6.25 13.25 5.75   2.5 4 -1.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.25 15 1.75 2     0.25
XIII PrN       0.25    
XIV NP 48 11.5 21.25 2 0.75     -1.25
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       5.75 9.5 7 5.5 -3.75
XVIIa ECh1 16.25 19.5 3.25 5 it.    
XVIIb ECh2 23.5 25.5 2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1 15 16.25 1.25 na    
XVIIIb EML2 21.25 23.5 2.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3.5 1.25 2.25 2.75 -2.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       3.5 7.75 6.75 6.25 4.25
I SL 25.5 7 6 5.5
 
10 11 11.5 11.75 MCh 4
11.75 19.5 8
-1