D   a   y       L   o   g
Friday 19. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 7.25 9.75 7 6 5.5 -2.75
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 11.75 16.75 2.25   2.5 4  
X FA         2.5 4  
XI F   16.75 18 1.25   2.5 4  
XII NCh 12.5 15.25 2.75 2     -0.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.5   2.5 4  
  S       2.25 9.5 7 5.5 -7.25
XVIIa ECh1 18 26.5 8.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       8.5 1.5     -7
XVIIIa EML1 7.25 11.25 4 na    
XVIIIb EML2 na    
XIX AL 11.25 11.75 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       4.5 1.25 2.25 2.75 -3.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 26.5 7 6 5.5
 
12.5 15.25 MCh 4
11.25
-1