D   a   y       L   o   g
Monday 22. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 3.25 5 7 6 5.5 2
II EX   0.75     ms
III MCh 3.25 3.5 0.25 1.25     1
II–III M       0.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 4 19.25 11.5   2.5 4 -7.5
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.5 14.5 2 2     ok
XIII PrN       0.25    
XIV NP F 15.5 20.5 1 0.75     -0.25
XII–XIV N       3 3     NA
XV S2b 3 2.75 2 ms
XVI S3 21.25 26.25 5   1.5 3 -2
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       5   1.5 3 -2
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       5 8 5.5 4 1
IX–XI FS       11.5   2.5 4 -7.5
  S       16.5 9.5 7 5.5 7
XVIIa ECh1 19.25 19.75 0.5 5 it.    
XVIIb ECh2 49 20.5 26.5 1 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.5 1.5      
XVIIIa EML1 3.5 4 0.5 na    
XVIIIb EML2 11 12.5 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 26.5 7 6 5.5
 
15.75 19.75 MCh 4
11 14.5 15.5 15.75 3.75
21.25 26.25 -1