D   a   y       L   o   g
Friday 26. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2.75 6.75 9.5 7 6 5.5 -2.5
II EX   0.75     ms
III MCh 47 6.75 8 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   8 11.5 3.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 11.5 17 5.5 2     -3.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       5.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 17 18 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1   1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS       1 8 5.5 4 -7
IX–XI FS       3.5   2.5 4  
  S       4.5 9.5 7 5.5 -5
XVIIa ECh1 18 19.75 1.75 5 it.    
XVIIb ECh2 21.5 23.25 1.75 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 19.75 21.5 1.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 23.25 7 6 5.5
 
incl. DN, LT MCh 4
10.25
-1