D   a   y       L   o   g
Sunday 28. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 6.75 9.25 7 6 5.5 -2.25
II EX   0.75     ms
III MCh 6.75 7.25 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 15.25 15.75 0.5 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.75 15.25 1.5 2     0.5
XIII PrN       0.25    
XIV NP 15.75 17.75 2 0.75     -1.25
XII–XIV N       3.5 3     NA
XV S2b 25.5 26 0.5 3 2.75 2 -1.5
XVI S3 47 7.25 24.5 13.25   1.5 3 -10.25
VII S1         4 2.75 2 -2
VIII + XV S2       1 4 2.75 2 -1
XVI S3       13.25   1.5 3 -10.25
VII+VIII+XV PS       1 8 5.5 4 -3
VII+VIII+XV+XVI RS       14.25 8 5.5 4 6.25
IX–XI FS           2.5 4  
  S       14.25 9.5 7 5.5 4.75
XVIIa ECh1 24.5 25.5 1 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1 1.5     0.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 26 7 6 5.5
 
13.75 17.75 MCh 4
3
-1