D   a   y       L   o   g
Monday 29. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2 8.25 6.25 7 6 5.5 0.75
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   14.75 17 2.25   2.5 4  
XII NCh 12.5 14.5 2 2     ok
XIII PrN       0.25    
XIV NP 47 14.5 21.5 1 0.75     -0.25
XII–XIV N       3 3     NA
XV S2b 3 2.75 2 ms
XVI S3 21.5 24.25 2.75   1.5 3 0.25
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.75   1.5 3 0.25
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.75 8 5.5 4 -1.25
IX–XI FS       2.25   2.5 4  
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 17 19.75 2.75 5 it.    
XVIIb ECh2 24.25 24.75 0.5 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 8.25 12.5 4.25 na    
XVIIIb EML2 19.75 20.75 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.25 1.25 2.25 2.75 -4
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.25 7.75 6.75 6.25 0.5
I SL 24.75 7 6 5.5
 
14.75 20.75 MCh 4
5.25
-1