D   a   y       L   o   g
Tuesday 30. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.75 5.75 5 7 6 5.5 2
II EX   0.75     ms
III MCh 47 6.75 11.25 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6 15.5 2.75   2.5 4 -2.25
X FA         2.5 4  
XI F 48 7 18.25 3.5   2.5 4  
XII NCh 49 11.5 17.25 2.75 2     -0.75
XIII PrN       0.25    
XIV NP 9.75 10.25 0.5 0.75     0.25
XII–XIV N       3.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25   2.5 4 -2.25
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 18.25 20 1.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 49 5.75 11.5 0.5 na    
XVIIIb EML2 20 21 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 21 7 6 5.5
 
7 8.5 9.75 10.25 MCh 4
6.75 13.5 8.5 12.5 13.5 17.25 7
6 11.25 12.5 15.5 -1