D   a   y       L   o   g
Wednesday 31. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -3 6.5 9.5 7 6 5.5 -2.5
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 6.5 17.5 3.75   2.5 4  
X FA         2.5 4  
XI F   17.5 18.5 1   2.5 4 -0.75
XII NCh 13.25 15 1.75 2     0.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       1.75 3     NA
XV S2b 23.25 23.5 0.25 3 2.75 2 -1.75
XVI S3 48 9.25 22.75 3.5   1.5 3 -0.5
VII S1         4 2.75 2 -2
VIII + XV S2       0.25 4 2.75 2 -1.75
XVI S3       3.5   1.5 3 -0.5
VII+VIII+XV PS       0.25 8 5.5 4 -3.75
VII+VIII+XV+XVI RS       3.75 8 5.5 4 -0.25
IX–XI FS       4.75   2.5 4 -0.75
  S       7.5 9.5 7 5.5 -2
XVIIa ECh1 18.5 22.25 3.75 5 it.    
XVIIb ECh2 49 22.75 23.25 0.5 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1 7.75 9.25 1.5 na    
XVIIIb EML2 15 16 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 23.5 7 6 5.5
 
7.75 12.25 13.25 16 MCh 4
12.25 22.25 6
LT -1