D   a   y       L   o   g
Thursday 1. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 5.25 5.75 7 6 5.5 1.25
II EX   0.75     ms
III MCh 47 6.25 9.75 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 16 7.75   2.5 4 -3.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 8.5 8.75 0.25 0.75     0.5
XII–XIV N       0.25 3     NA
XV S2b 22.75 23.75 1 3 2.75 2 -1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       1 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -3
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       7.75   2.5 4 -3.75
  S       8.75 9.5 7 5.5 -0.75
XVIIa ECh1 18 22.75 4.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.75 1.5     -3.25
XVIIIa EML1 5.25 6.25 1 na    
XVIIIb EML2 16 18 2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 23.75 7 6 5.5
 
6.5 7.5 8 8.75 1st & 3rd = LT... MCh 4
7.5 8 8.5 9.75 6.5
-1