D   a   y       L   o   g
Wednesday 7. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -6.75 5.25 12 7 6 5.5 -5
II EX   0.75     ms
III MCh 5.75 6.5 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 19.75 7.75   2.5 4 -3.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 15.5 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 15.5 16.5 1 0.75     -0.25
XII–XIV N       3.5 3     NA
XV S2b 21.5 24 2.5 3 2.75 2 0.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2.5 4 2.75 2 0.5
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -1.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       7.75   2.5 4 -3.75
  S       10.25 9.5 7 5.5 0.75
XVIIa ECh1 19.75 21.5 1.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 47 5.25 9 1.5 na    
XVIIIb EML2 12 13 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       13 7.75 6.75 6.25 -5.25
I SL 24 7 6 5.5
 
5.75 8 MCh 4
8 9 12 16.5 5
-1