D   a   y       L   o   g
Thursday 8. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 5.5 5.5 7 6 5.5 1.5
II EX   0.75     ms
III MCh 47 5.5 9.5 4 1.25     -2.75
II–III M       4 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   9.5 18 8.5   2.5 4 -4.5
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.5   2.5 4 -4.5
  S       8.5 9.5 7 5.5 -1
XVIIa ECh1 20.25 24 3.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 18 20.25 2.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 24 7 6 5.5
 
incl. DN, LT MCh 4
7.75
-1