D   a   y       L   o   g
Saturday 10. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2 4.5 6.5 7 6 5.5 0.5
II EX   0.75     ms
III MCh 47 4.5 9.25 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   5.5 7.75 2.25   2.5 4 -2.25
X FA         2.5 4  
XI F 48 9.25 18.25 7   2.5 4 -3
XII NCh 13 14.5 1.5 2     0.5
XIII PrN       0.25    
XIV NP 49 7.75 13 1.25 0.75     -0.5
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.25   2.5 4 -5.25
  S       2.25 9.5 7 5.5 -7.25
XVIIa ECh1 18.25 21 2.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 21 7 6 5.5
 
5.5 8.5 MCh 4
12.5 14.5 6
8.5 12.5 -1