D   a   y       L   o   g
Tuesday 20. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -4.5 5.5 10 7 6 5.5 -3
II EX   0.75     ms
III MCh 5.5 6.25 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 6.25 19 10.25   2.5 4 -6.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.25 14.75 2.5 2     -0.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 22 22.25 0.25 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.25 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -3.75
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -3.75
IX–XI FS       10.25   2.5 4 -6.25
  S       10.5 9.5 7 5.5 1
XVIIa ECh1 20.25 22 1.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 19 20.25 1.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 22.25 7 6 5.5
 
12.25 14.75 MCh 4
5
-1