D   a   y       L   o   g
Saturday 24. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 9.5 11.5 7 6 5.5 -4.5
II EX   0.75     ms
III MCh 9.5 14.5 5 1.25     -3.75
II–III M       5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 14.5 16 1.5 0.75     -0.75
XII–XIV N       1.5 3     1.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 47 16 28.5 12.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       12.5 1.5     -11
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       13 7.75 6.75 6.25 -5.25
I SL 28.25 7 6 5.5
 
DN MCh 4
17.5
-1