D   a   y       L   o   g
Sunday 25. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 4.5 11.75 7.25 7 6 5.5 -0.25
II EX   0.75     ms
III MCh 47 11.75 18 6.25 1.25     -5
II–III M       6.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 48 18 22.5 1 0.75     -0.25
XII–XIV N       1 3     NA
XV S2b 17 18 1 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       1 4 2.75 2 -3
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -7
VII+VIII+XV+XVI RS       1 8 5.5 4 -7
IX–XI FS           2.5 4  
  S       1 9.5 7 5.5 -8.5
XVIIa ECh1 18.5 22 3.5 5 it.    
XVIIb ECh2 22.5 23.25 0.75 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 23.25 7 6 5.5
 
DN MCh 4
18.5 22 10.5
-1