D   a   y       L   o   g
Tuesday 27. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.25 7.5 7.25 7 6 5.5 -0.25
II EX   0.75     ms
III MCh 7.5 7.75 0.25 1.25     1
II–III M       0.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   8.25 11.5 3.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.5 14.5 2 2     ok
XIII PrN       0.25    
XIV NP 15.25 17.75 2.5 0.75     -1.75
XII–XIV N       4.5 3     NA
XV S2b 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       3.25   2.5 4 0.75
  S       3.25 9.5 7 5.5 -6.25
XVIIa ECh1 17.75 24.75 7 5 it.    
XVIIb ECh2 na     ok
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       7 1.5     -5.5
XVIIIa EML1 47 7.75 12.5 1.5 na    
XVIIIb EML2 14.5 15.25 0.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 24.75 7 6 5.5
 
8.25 11.5 MCh 4
9.25
-1