D   a   y       L   o   g
Tuesday 8. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3.5 9.5 6 7 6 5.5 1
II EX   0.75     ms
III MCh 9.5 11 1.5 1.25     -0.25
II–III M       1.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 16 3 2     -1
XIII PrN       0.25    
XIV NP 11 13 2 0.75     -1.25
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 16 22.25 6.25   1.5 3 -3.25
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       6.25   1.5 3 -3.25
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       6.25 8 5.5 4 -1.75
IX–XI FS           2.5 4  
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 22.25 23.5 1.25 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       1.25 1.5     0.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       8 7.75 6.75 6.25 -0.25
I SL 23.5 7 6 5.5
 
MCh 4
5.75
LangLab Day 1