D   a   y       L   o   g
D   a   y       L   o   g
Monday 14. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.75 6.5 4.75 7 6 5.5 2.25
II EX   0.75     ms
III MCh 6.5 7.75 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 7.75 19.25 7.25   2.5 4 -3.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 49 14.5 17.25 2.25 2     -0.25
XIII PrN       0.25    
XIV NP F 17.25 17.75 0.5 0.75     0.25
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.25   2.5 4 -3.25
  S       7.25 9.5 7 5.5 -2.25
XVIIa ECh1 19.25 20 0.75 5 it.    
XVIIb ECh2 20.5 22 1.5 na     ms
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 12.5 13.5 1 na    
XVIIIb EML2 na    
XIX AL 47 14.25 20.5 1 1.25 2.25 2.75 0.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.25 7.75 6.75 6.25 2.5
I SL 22 7 6 5.5
 
14.5 17.75 18 20 MCh 4
12.5 13.5 14.25 16 16.5 18 5.75
16 16.5 -1