D   a   y       L   o   g
Wednesday 16. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.25 7 4.75 7 6 5.5 2.25
II EX   0.75     ms
III MCh 7 7.75 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 7.75 22.25 10.25   2.5 4 -6.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 48 14.5 17 2.25 2     -0.25
XIII PrN       0.25    
XIV NP F 17 17.75 0.75 0.75     ok
XII–XIV N       3 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       10.25   2.5 4 -6.25
  S       10.25 9.5 7 5.5 0.75
XVIIa ECh1 22.25 23.25 1 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       1 1.5     0.5
XVIIIa EML1 13.25 14.5 1.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 23.25 7 6 5.5
 
13.25 16 16.25 17.75 MCh 4
16 16.25 4